Commercial fire sprinkler inspections in Maryland: what is due quarterly, yearly and every five years.
Most owners and property managers know the sprinkler system gets inspected once a year. Fewer know the standard behind that visit also lists work due every quarter, every third year and every fifth year, and that the fire marshal reads the report with that whole list in mind. This is the schedule in plain words, what the report looks like, what happens to the findings on it, and who the county holds responsible when the paper is missing.
The standard behind every inspection
The schedule comes from NFPA 25, the national standard for inspecting, testing and maintaining water based fire protection systems. Maryland’s State Fire Prevention Code adopts the national fire code, and the county fire marshals enforce it. Anne Arundel County’s Fire Marshal names NFPA 25 outright for sprinklers and standpipes. Howard County’s inspection guidance says sprinkler systems get annual inspection, testing and maintenance by a licensed technician, and adds that parts of these systems are also due monthly, quarterly, twice a year and at five and ten years.
The standard uses three words on purpose. An inspection is a look, to see that the system appears to be in working order and is not damaged. A test makes a part of the system do its job, such as flowing water to ring the alarm. Maintenance is the work that keeps the equipment working or repairs it. A full report covers all three.
NFPA 25 is reissued every few years and a few intervals move between editions, so the report names the edition it was done under. The items below are the ones an owner should expect to see on it.
Between visits: what building staff can check
The standard lists weekly and monthly looks at the control valves and the gauges. With some guidance from us, a building engineer or a manager can do these and keep a log.
- Every control valve is reachable, open, and locked, sealed or supervised.
- Nothing is leaking at the valves.
- Each valve has a sign saying which part of the building it controls.
- The gauges are in good shape and read normal pressure.
- On a dry system, the air pressure gauge reads normal too.
A log of these checks matters more than it looks. Prince George’s County asks for a full commissioning inspection when a new tenant applies for a certificate, unless a continuous inspection log has been kept. See a valve that is closed or a gauge at zero on your own walk? Call or text (240) 222-5257 with a photo of it right then, because part of the building may have no water behind the heads.
What is due every quarter
The quarterly list is short, and it is the one most buildings skip, because nobody calls it an inspection.
- The alarm devices. The waterflow and valve supervisory devices are looked at for damage.
- The water motor gong. A mechanical flow alarm is tested every quarter. Electric flow switches are tested twice a year.
- The fire department connection. It has to be visible and reachable, with the caps on, the swivels turning, the gaskets in, the sign in place and the check valve not leaking.
- Pressure reducing valves. Open, not leaking, handwheel in place and holding the pressure the design calls for.
- A main drain test, on some systems. Where the only water supply comes through a backflow preventer or a pressure reducing valve, one main drain test downstream of it is due every quarter.
The main drain test is the one that catches a valve left partly closed in the street or a backflow device that has started to stick. Most commercial systems in Maryland are fed through a backflow preventer, so most of them have this quarterly test on their list.
What the yearly inspection covers
This is the visit the county means when it asks for the annual report. It takes a licensed sprinkler technician, and it covers the whole system.
- Every head, from the floor. A head that is leaking, corroded, damaged, painted, loaded with dust or grease, or missing fluid in its glass bulb gets replaced. So does a head installed in the wrong position.
- Clearance under the heads. Stock, shelving or equipment closer than the rule allows has to move. For standard heads the rule is usually 18 inches.
- Pipe, fittings and hangers. Checked for leaks, corrosion and damage.
- The spare head cabinet. At least two spare heads of each type and temperature rating in the building, and a wrench that fits each type.
- The main drain test.Run and written down, so this year’s reading can be set beside last year’s.
- The valves. Operated and maintained.
- Antifreeze. If a loop has it, the solution is tested.
- The dry pipe valve. On a dry system, a trip test with the control valve partly open, and the inside of the valve inspected and cleaned.
- The fire pump. If the building has one, a flow test once a year, on top of the short runs with no water flowing that are due through the year.
The backflow preventer has its own yearly test under the water utility’s rule. WSSC wants testable assemblies tested every year in Montgomery and Prince George’s, and Frederick County’s rules say the same. Our backflow testing pagehas each utility’s version. Not sure when the last yearly inspection was done? Text a photo of the tags hanging on the riser to (240) 222-5257 and we will read the dates for you.
The three year and five year items
These are the lines that go missing when a building changes inspection companies or managers. Nobody remembers the last time they were done, and the old reports are gone.
- Dry systems, every three years. A full flow trip test of the dry pipe valve and an air leakage test.
- Gauges, every five years. Each gauge is replaced, or tested against a calibrated gauge. One that reads more than 3 percent of full scale off is recalibrated or replaced.
- Check valves, every five years. Opened and inspected inside to see that the parts move freely and are in good condition.
- The inside of the pipe, every five years. At the least, a flushing connection is opened at the end of one main and a head is taken out at the end of one branch line, to look for rust, scale, slime or anything else that could block a head.
- Pressure reducing valves, every five years. A full flow test, compared with the last one.
Heads have clocks of their own. A standard head that has been in service 50 years is replaced, or a sample goes to a testing lab and is tested again every 10 years after that. Fast response heads and dry heads come due sooner. Heads in harsh places, such as under an outside canopy or in a freezer, are replaced or sample tested every five years. If one head in a sample fails, every head in the area that sample stands for is replaced.
The five year pipe inspection is the one that turns up real trouble in older Maryland buildings. If a report says the five year work is overdue, the heads may open onto a blocked pipe and nobody can say either way until it is looked at. Get it done this week. Call or text (240) 222-5257 with a photo of the report and the age of the building, and we will tell you which of these lines are due.
What the report looks like
The standard says a record is made of every inspection, test and maintenance job, and that the record shows what was done, who did it, the results and the date. Those records have to be handed to the fire official on request. In practice an owner should be holding these after each visit.
- The inspection and test form, with each item marked and each reading written in.
- The technician’s name, company and credential.
- The main drain readings, to compare year over year.
- A list of findings, each with its location.
- A dated tag on the riser.
The counties add their own rules on top. Howard County wants a copy of each report kept on the premises, and the company that did the work files it through the county’s contractor portal. Anne Arundel wants the documentation on hand when the Fire Marshal walks in. Prince George’s wants the annual report done by a NICET Level III inspector, within the last 365 days and with no deficiencies on it, before it will issue its fast certificate for a new owner or tenant. Our piece on the sprinkler report for use and occupancy goes county by county.
Keep the original drawings, the hydraulic calculations and the acceptance test records for the life of the system. They are what make a tenant fit out or a repair permit go smoothly years later.
What happens to the deficiencies
Findings on a report are sorted into three classes, and each one means something different for the building.
- An impairment. Part of the system may not work in a fire. A closed valve, a frozen and split pipe or a pump that will not start are impairments.
- A critical deficiency. The system still works, but the finding can have a real effect on how well it does in a fire if it is left alone.
- A noncritical deficiency. The system would still do its job, and the finding still has to be corrected to meet the standard.
An impairment starts a clock. Howard County requires a fire watch for any system out of service or impaired for more than four hours. Anne Arundel says the building is evacuated or a fire watch is set up whenever a required system fails or is impaired. A fire watch is paid people walking the building around the clock until the water is back on.
Deficiencies do not close on their own either. Anne Arundel’s guide says all deficiencies noted on inspection reports must be corrected. Howard says they shall be corrected immediately. Baltimore County issues its fire code certificate once any violations are cleared. A report with open findings on it also follows the building. It comes up at the next fire inspection, at a sale, at a refinance and when a new tenant applies for a certificate.
So every line on the report gets fixed, the impairments first. Call or text (240) 222-5257 with a photo of the report this week and we will price each finding and the clean report that follows the repair. If the report came from a failed county inspection, our guide to a failed sprinkler inspection covers the reinspection.
Who the fire marshal holds responsible
The owner. NFPA 25 makes the owner responsible for maintaining the building’s sprinkler system, and Prince George’s County Code says fire protection systems shall be maintained in operative condition at all times. Hiring an inspection company does not move that duty. The company answers for doing the inspection right. The owner answers for having it done and for fixing what it finds.
Tenants and managers come into it through the lease and through who controls the system. Anne Arundel’s guide draws the line this way. A single tenant, or a large tenant with its own stand alone system, is the responsible party for the documentation. In a building with several tenants it is the property owner, the management company or the condo association.
- Owners. Read the lease and the management agreement for who orders the inspection and who pays for repairs. If it is not written down, the county treats it as yours.
- Property managers. Keep one file per building with every report, and a calendar with the quarterly, yearly, three year and five year dates on it.
- Tenants. Ask the landlord for the last report and its date before the lease is signed. A triple net lease can hand you the whole system.
- General contractors.After a fit out, the altered system needs its own test and paperwork, and the building’s yearly schedule picks up from there.
State law says nobody may provide services as a fire sprinkler contractor in Maryland without a license from the State Fire Marshal. On our jobs the licensed sprinkler contractor on the job designs the repair, installs it and pulls the sprinkler permit. A maintenance crew that swaps a head or closes a valve on its own has changed a fire protection system with no record behind it, and the next report will say so.
What drives the price
Two buildings on the same street can price far apart. These are the things that move the number, and our guide to inspection pricing goes further into each one.
- The size of the system. The number of risers, floors, valves and heads sets the time on site.
- The type of system. A dry system, a fire pump, a standpipe or an antifreeze loop each add tests of their own.
- Which year it is. A three year or five year visit carries more work than a plain yearly one.
- How often we come. Quarterly visits on a contract price differently from a single yearly call.
- The credential on the report.A NICET Level III report for Prince George’s is a different visit from a routine yearly check.
- Access. Locked suites, tenants who need notice, work after hours and heads above a hard ceiling all add time.
- What the inspection finds. Repairs, parts and any permit are priced once the findings are known.
Call or text (240) 222-5257 with the address, the number of floors and a photo of the riser, and we will send a written quote that says what each visit includes.
What to send us
- The address, the county and what the building is used for.
- The last inspection report, or a note that nobody has it.
- A photo of the riser with its gauges and tags.
- Whether the building has a dry system, a fire pump or a standpipe.
- Any notice or correction order from the fire marshal.
- Who holds the keys to the valve room, and the tenants who need notice.
We inspect and repair commercial sprinkler systems in Montgomery, Prince George’s, Baltimore County, Baltimore City, Anne Arundel, Howard and Frederick. The other commercial work we handle, from new systems to tenant fit outs, is in our guide to commercial fire sprinkler systems in Maryland.
Not sure what is due on your building?
Call or text the address and a photo of the riser tags or the last report. We tell you what is due, what is overdue, and send a written quote for the inspection and any repairs.
Call (240) 222-5257